Huzhou-Hangzhou Expressway

Huzhou-Hangzhou Expressway


Huzhou–Hangzhou Expressway, abbreviated as "Huhang Expressway," is a provincial expressway in Zhejiang Province, with the English name "Huzhou–Hangzhou Expressway." Construction of the route began in September 2020, and the opening ceremony was held on September 26, 2024, with formal operations commencing at midnight the following day. The main line spans a total length of 44.9 kilometers and is built to a six-lane, two-way standard with a design speed of 120 km/h. It passes through Wuxing District, Nanxun District, and Deqing County, connecting key interchanges such as Zhili Hub, Shuanglin Hub, Shilin Hub, and Xin'an Hub, while linking to existing road networks including the Shen–Su–Zhe–Wan Expressway, Shen–Jia–Hu Expressway, Hangzhou West Ring Expressway, and Lian–Hang Expressway. Along the route, there are five toll stations—Zhili East, Nanxun West, Linghu, Qianjin, and Xiashe—and one service area. The toll collection period is set from September 27, 2024, to September 26, 2039.